Knowledge hub / AI risk management

AI risk management

Write risks people can make decisions about.

A good risk register explains a scenario, a consequence, and an accountable response. It does not need theatrical scoring.

The system view A conceptual view to help connect the parts. It is an illustration, not a product architecture. Select the image to enlarge.

Replace labels with scenarios

“Hallucination risk” is too broad to assign useful work. Try: “The assistant invents a cancellation condition, and a customer relies on it when making a purchase.” Name the trigger, behavior, affected party, and consequence. A scenario gives technical and business teams something concrete to investigate together.

Keep causes, controls, and consequences apart

A broad tool permission is an exposure. An unauthorized payment is an event. Financial loss is a consequence. A transaction limit is a control. Mixing them in one field makes it hard to tell what needs changing. Link the record to the inventory entry and the part of the workflow where the issue could occur.

Use ratings with an explanation

A color or number can help prioritize work, but it should not replace the reasoning. Describe the expected impact, conditions that make the event plausible, evidence available, and confidence in the estimate. Avoid multiplying poorly understood numbers and presenting the result as a measured fact. Unknowns may justify investigation before a final rating.

Distinguish planned controls from working controls

“Human approval” in a design document does not establish that the deployed action tool checks approval. Record who will implement the control, how it will be tested, and where the test evidence lives. Reassess residual risk after evaluating the control. A risk owner should understand what exposure remains when deciding whether to accept it.

Make review part of operations

Give each open item an owner, due date, decision status, and review trigger. Revisit records after incidents, model changes, new integrations, and changes in the use case. Close a record only with an explanation. It should be possible for someone arriving later to understand both the decision and the evidence behind it.

The whiteboard A visual recap of the questions, decisions, and evidence on this page. Select the image to enlarge.

PUT IT INTO PRACTICE

A useful next step

  1. Write one risk as a complete scenario.
  2. Separate existing and proposed controls.
  3. Assign a risk owner and an action owner.
  4. Link a verification result before accepting residual risk.

Keep the result: record the decision, owner, supporting evidence, and the next review trigger.

Go to the source

These links support further learning. The worked example and practical exercise are SyruSec’s own educational interpretation.

KEEP THE THREAD GOING

Related reading.

Illustration